Stremke’s Laws

Two models of how a system drifts away from its design. One follows a workaround as it spreads. The other starts on the day two systems merge.

The second law

Stremke’s Law of Merged Systems

A companion to the Law of Compliance Erosion. The first model follows people learning a shortcut. This one begins with people who already know the old way.

When two systems merge, the winner keeps the structure and the loser keeps the habits.

Imagine moving a studio to a new project tool. The old tool showed team leads who could take the next job. The new one lists every assignment, but answering that question takes several searches. So the leads keep a spreadsheet. It saves them time. When the two schedules disagree, someone else has to work out which designer is actually free.

  1. 01
    Structure follows power. Start with a merger where one side gets to choose the common system. The team with that decision can be the smaller of the two.
  2. 02
    Function follows use. Look for the question the old system answered. If people still need that answer, they may keep the spreadsheet, the phone call or the handoff the new system left out.
  3. 03
    Follow the cost across teams. A shortcut can save its user time while creating work for someone else. The team’s average can rise even while the shortcut still pays. I call it merger debt when even the people taking the shortcut spend more effort than before.

Figure 1 · Where a merger lands

Using the merged system versus keeping the old way

The starting cost is 50 units of effort per person for one comparable job. The buttons set the percentage of people from the displaced system who use a shortcut. The slider sets how much of the whole group came from that system. All figures are illustrative.

HOW THE CUTS WERE CHOSEN
THE SEAM

Share of people whose system was replaced

s = 0.50

ILLUSTRATIVE SCENARIOS

The structure that won · the merged system

The habit that went underground · the old way

    Fig. 1 The gold curve weights each route by how many people use it. In the shaded region, both routes cost more than the pre-merger baseline. The lower strip marks the first law’s crossover for comparison.

    One hundred people

    Most people pay more. How can the average fall?

    Suppose all 100 studio employees change tools and 20 keep the familiar spreadsheet. Each of those 20 saves 35 units on the task itself. All 100 spend an extra 3.6 units reconciling the records.1

    The 80 using the new tool now spend 53.6 each. The 20 using the sheet spend 18.6 each. That’s 360 units in extra work and 700 saved across the studio. The average falls from 50 to 46.6, even though four people in five would tell you the change made their job harder.

    Figure 2 · When the laws meet

    What if the shortcut catches on before the new tool arrives?

    Suppose some people in a studio of 100 already send requests by message. The day before a new scheduling tool launches, 15 more leave the form and start messaging. Choose when that rush happens on the Compliance Erosion curve.

    Starting point

    Effort per person for one job

    Studio average and shortcut cost before and after the rush
    Studio averageShortcut userOriginal cost · 50

    On the eve of launch

    Fig. 2 Each person does one comparable job. Both groups carry the first law’s shared cleanup. On launch day, each sender spends three extra units checking that their message made it into the new queue. The form takes the same effort and nobody switches routes. If a scheduler does those checks instead, that work belongs in the scheduler’s cost.

    When someone says the new software made things worse, ask what the job cost the day before it launched.

    Inventory use, not features.

    Ask who used the missing feature and what it helped them decide. Count people doing the same task. A feature list alone gives you little basis for estimating shortcut use.

    Give the seam an owner.

    Follow one job across the boundary. Who translates the record? Who fixes discrepancies? Compare the time an owner saves with the time that person spends doing the work.

    Check the baseline.

    Observe comparable jobs before and after the change. Track turnaround and errors alongside effort. If staff already used the spreadsheet before the move, credit only the additional saving.

    Explore the equations, thresholds and evidence →

    The model

    Each person completes one comparable job. The model assigns both groups the same starting cost of 50 and the same shared overhead after the merger. All constants are illustrative. Here “the seam” means the effort of coordinating across the two original groups.

    p₀ = ks(1)s is the share of everyone whose system is replaced. k is the share of that group who use the old route for this task. Multiplying those fractions gives the share of all people on the old route.
    c = 50, w₀ = 15(2)Without overhead, the official route costs 50 and the practiced shortcut costs 15. At a given level of shared work, the shortcut saves its user 35.
    B = 90p₀² + Hs(1 − s)(3)Everyone pays B. The first term represents reconciling unofficial work. The second represents coordination across groups. H is 100 by default and 50 with an owner. At s = 1, cross-group coordination is zero by construction.
    Cₘ = 50 + B(4)Each person taking the official route pays this amount.
    Wₘ = 15 + B(5)Each person taking the familiar route pays this amount. Both routes exceed the common starting cost exactly when B > 35. This is merger debt in this model.
    A = (1 − p₀)Cₘ + p₀Wₘ(6)Count people on each route. Weighting both route costs equally would assume that half the people took each one.
    A − 50 = B − 35p₀(7)On average, shared work must exceed the savings per person for the group to pay more. Equality is break-even. With no shortcut users, only the official cost is experienced. With everyone on the shortcut, the group average equals its cost.

    Curve reference · Compliance Erosion

    Where both examples land on the erosion curve

    Curve reference The gold band shows the shortcut share from Figure 1. On the orange curve, the open circle marks the studio before the rush in Figure 2 and the filled circle marks launch eve. The dashed line marks the first law’s 62.19% crossover. A merger with a practiced shortcut and extra coordination has its own thresholds.

    When each threshold holds

    For the average, substituting p₀ = ks gives A − 50 = s[(H − 35k) + (90k² − H)s]. For both routes to exceed 50, shared cost must exceed 35. The table solves each inequality across the full slider range.

    Share s for which each comparison holds. Boundaries are approximate and rounded to three decimals. “All” covers 0 < s ≤ 1.
    kHAverage above 50Both routes above 50
    0.2500 < s < 0.927None
    0.21000 < s < 0.965None
    0.650AllNone
    0.6100All0.568 < s < 0.911
    0.950Alls > 0.558
    0.9100Alls > 0.392

    With k = 0.2, H = 50 and s = 0.95, coordination still costs 2.375 units per person. The weighted saving of 6.65 exceeds the total shared cost of 5.624, bringing the average to 48.974. A lower average can occur even when both groups are present.

    At fixed s and H, the slope of average cost with respect to p₀ is 180p₀ − 35. Below p₀ ≈ 0.194, retiring a few shortcuts removes more private savings than shared cleanup. Above that share, reducing shortcut use lowers the average. A lower H saves s(1 − s) per unit of H removed, before accounting for the owner’s own cost.

    What would change the conclusion?

    Who actually pays? One scheduler may do most of the reconciliation. Charge work to the people who do it, and check each group before drawing a conclusion about everyone.

    Which unit is being counted? Here k counts affected people taking an old route. If you observe task occurrences instead, weight the results by occurrences and report cost per task. Count double entry, dropped work and staff departures separately.

    What if the model’s baseline is wrong? Measure the actual before-cost for each group. Include training, conversion, quality and wider benefits in any assessment of the deal. For a business case, the cost to recover is the increase over baseline multiplied by comparable work volume.

    Is this the right kind of merger? A joint redesign can retain features from both groups. Separate units may share little work. Either case calls for measuring how often their work crosses a boundary before assigning a common overhead.

    What would I test? Follow the same kind of job before launch, after launch and once people know the tool. Record who takes which route, who saves time, who reconciles the records, and whether errors change. If the sheet persists without causing rework for others, reduce the assumed shared cost.